Sysdrill® cementing optimization and analysis is used for planning cementing operations to ensure the secure and safe installation of casing strings. It is used to optimize pumping operations for variable flow rate pump schedules, fixed flow rate, fixed bottom hole pressure and free fall to manage downhole pressures.
 |
During calculations, an animated wellbore schematic displays fluid flow regimes, bottom hole pressures, ECD’s and flow rate as cements are circulated into position.
Bottom hole pressures are plotted against formation breakdown pressure to prevent fracture. Expected pump, choke & hydrostatic pressures and pressure losses are also calculated. |